The 7 Steps to Going Solar

We know going solar can be complicated. We are here as your expert guide every step of the way.
With our customers, we are creating a planet run by the sun.

steps-survey-home2.png

SITE SURVEY 

steps-design-plans2.png

SYSTEM DESIGN 

steps-permitting-certificate2.png

PERMITTING

steps-installation-home2 (1).png

INSTALLATION 

steps-inspections-clipboard2.png

INSPECTIONS 

steps-hookup-battery2.png

UTILITY HOOKUP 

steps-power-light2.png

POWER ON 

1. Site Survey

 

An expert  Site Technician will visit to measure, review and finalize the plans we initially discussed. Just show them in and get back to your day.

1-site-survey.png

2. Design Review

 

We follow-up to review any tweaks or changes to our initial plan and make sure you're happy with the result.

2-design-review.png

3. Permitting

 

We'll handle the permitting and paperwork with the city. We'll let you know when everything is good to go.

3-permitting.png

4. Installation

 

Your roof gets an upgrade! The average install will take about a day, but you just need to be there to let us in.

4-installation.png

5. City Inspection

 

Once your system is installed, we'll schedule the inspection with the city. A representative will stop by to ensure the new system is up to code.

5-city-inspections (1).png

6. Utility Connection

 

We'll work with your utility to get everything connected. The utility will connect your system to the grid and may need to install a new meter.

6-utility-connection.png

7. Power On

 

Flip the switch, sit back and put the sun to work for you!

7-power-on.png